Pacific Pools

Pacific Pools Consultants completed in August 2008 Auckland’s first water features park as part of Auckland City Council Lagoon pool at a cost of $600k approximately. The water features are PLC controlled with varying patterns of operation and a degree of control by participating kids.

In 2007, Pacific Pools Consultants participated in the design and construction of a $10m extension of the Whangarei Aquatic Centre. A  wave pool, spa, hydrotherapy, slide and toddlers pools were built adjacent to the existing lane pool.

In 2007, Pacific Pools participated in the design and installation of the first of two hydroslides at Lagoon Pool, Auckland.

At present (2008), Pacific Pools Consultants are involved in the design of a new hydrotherapy pool for Hamilton City. PPC are responsible  for the pool plant, mechanical ventilation and electrical services throughout.

During summer 2008, Pacific Pools Consultants have been commissioned to detail the heating, ventilation and pool plant engineering for Carlow Park Development in Auckland as well as Metlifecare new residential village in Takapuna.

Whangarei Aquatic Centre

Whangarei Aquatic Centre

Whangarei Aquatic Centre

Whangarei Aquatic Centre

Whangarei Aquatic Centre

Auckland City Council Lagoon

Auckland City Council Lagoon Pool

Whangarei Aquatic Centre

Hydroslides at Lagoon Pool, Auckland