In 2007, Pacific Pools Consultants participated in the design and construction of a $10m extension of the Whangarei Aquatic Centre.  A wave pool, spa, hydrotherapy, slide and toddlers pools were built adjacent to the existing lane pool.

Works also completed by Pacific Pools Consultants include the design and installation of the first of two hydroslides at Lagoon Pool, Auckland,  and the design of a new hydrotherapy pool for Hamilton City.   Pacific Pools Consultants completed the design for the pool plant, mechanical ventilation and electrical services throughout.

Pacific Pools Consultants has also completed Auckland’s first water feature park as part of Auckland City Council Lagoon pool at a cost of $600k approximately. The water features are PLC controlled with varying patterns of operation and a degree of control by participating children.   Pacific Pools Consultants was commissioned to detail the heating, ventilation and pool plant engineering for Carlow Park Development in Auckland and the Metlifecare new residential village in Takapuna.

Sam1

Sam Mukhtar

Principal
Mechanical Engineer
BSc(Hons), MSc Building Services,
MIPENZ, CPEng, Int PE(NZ)
lap_pool_thumb

Whangarei Aquatic Centre

hydroslide_thumb

Lagoon Pool Hydroslide, Auckland

metlifecare_retirement_village123

Metlifecare Retirement Village